logo
Shenzhen Perfect Precision Product Co., Ltd.
produtos
Notícia
Casa > Notícia >
Notícia da empresa aproximadamente How CNC Machined Aluminum Mounting Brackets Improved Assembly Efficiency for Precision Instruments
Eventos
Contactos
Contactos: Lyn
Contacte agora
Envia-nos.

How CNC Machined Aluminum Mounting Brackets Improved Assembly Efficiency for Precision Instruments

2026-07-27
Latest company news about How CNC Machined Aluminum Mounting Brackets Improved Assembly Efficiency for Precision Instruments

Name: Robert K.

Company Type: Precision instrument manufacturer

Region: California, USA

Time: August 2025

Customer Core Problem:

The customer needed a reliable supplier for a custom 6061-T6 aluminum mounting component with multiple machining features. Their previous supplier struggled with inconsistent hole positions, surface marks, and uneven finishing quality, which increased assembly adjustments.

Our Solution:

We developed a complete CNC milling process including multi-side machining, drilling, tapping, deburring, surface preparation, anodizing, and laser marking. By optimizing fixture positioning and inspection procedures, we achieved stable dimensions and consistent appearance across production batches.

últimas notícias da empresa sobre How CNC Machined Aluminum Mounting Brackets Improved Assembly Efficiency for Precision Instruments  0últimas notícias da empresa sobre How CNC Machined Aluminum Mounting Brackets Improved Assembly Efficiency for Precision Instruments  1

Project Parameters:

Material: 6061-T6 aluminum
Process: CNC milling, finishing, anodizing, laser marking
Component Type: Precision mounting bracket
Production Stage: Prototype verification and repeat production

Customer Feedback:
“Your team handled machining and finishing as one complete process. The parts arrived ready for assembly and reduced our internal adjustment time.”
Final Result:

The customer approved the initial batch and placed repeat orders totaling 1,200 pieces with a project value of $22,500. Further custom aluminum components were added to the supply program.